{"id":792,"date":"2023-03-24T16:44:12","date_gmt":"2023-03-24T16:44:12","guid":{"rendered":"https:\/\/solarsunair.co.uk\/?p=792"},"modified":"2023-03-24T16:44:16","modified_gmt":"2023-03-24T16:44:16","slug":"charlton-mead-solar-panels-and-battery-storage","status":"publish","type":"post","link":"https:\/\/solarsunair.co.uk\/charlton-mead-solar-panels-and-battery-storage\/","title":{"rendered":"Charlton Mead- Solar Panels and Battery Storage"},"content":{"rendered":"\n
\n
System Size<\/h5>\n\n\n\n
7.2kW<\/p>\n\n\n\n
Location<\/h5>\n\n\n\n
Charlton Mead, Bristol<\/p>\n\n\n\n
Reason For Install<\/h5>\n\n\n\n
Reduce energy consumption from grid, saving money and using sustainable energy<\/p>\n\n\n\n
More Information about this Installation<\/h4>\n\n\n\n
The owners of this property wanted to do something to save money on energy bills and start drawing from a renewable source of power. We specified a 7.2kW solar panel system to be installed on the roof, alongside a hybrid inverter to allow charging of the 15kWhs of battery storage to be fitted.<\/p>\n\n\n\n